Before
Long-lead items waiting on paper.
With Beem
Packages out early, material released on time.
Submittal packages, done for you
We search out every item you have to submit and the cut sheet for each one, then check every sheet against your drawings and spec. Our trade experts look it over, and the package is back to you within 48 hours with comments. You make two calls, brand and scope, and send it on for review. There's no software to learn.




Before
Long-lead items waiting on paper.
With Beem
Packages out early, material released on time.
Before
Items your estimate missed, and you're still on the hook for them.
With Beem
Every item listed up front, while there's still time to price the gap.
Before
Nights and weekends building packages.
With Beem
We build the package. You make the calls.
Before
Rejections that restart the clock.
With Beem
Each answer cites its page for the reviewer.
Product data submittals for
PlumbingLightingElectricalHVAC
Long-lead items can't be released until the submittal is approved. Every week a package sits comes off the back of the schedule.
Send it early, and the lead time runs while the job still has room.
The common enemy
Every round trip starts with a miss: a requirement buried in a schedule note, or a sheet for the wrong model. Someone has to find it, and the later it turns up, the more it costs everyone on the job.
Without Beem
Every resubmittal starts the clock over
With Beem
How it works
You send

Project manual
Specifications
Divisions 21 to 28
Drawings and spec book
Beem
We find every item and check each option against the spec.
You get back

Mechanical
M-005VAV terminal unit, 8 in. inletBasis of design: Titus DTQS
M-029Plenum slot return diffuser
M-032Ceiling cabinet exhaust fan
and every other item in the set
Every item listed
Options checked
A package ready for your calls
What you get
The submittal is the first time your material list meets the drawings line by line. Anything your estimate missed is still yours to supply, and finding it here leaves time to raise it before it comes out of your margin.
Every schedule row is reconciled against the drawings and spec, and what's missing gets flagged instead of dropped.
The basis of design, plus the alternate brands the spec allows when you want a choice, each with a checked data sheet.
When the basis-of-design sheet isn't available, we attach the closest match from our library and flag it for you.
Each answer cites the page it came from, so the package answers the reviewer before they ask.
When the job's complete, download the finalized closeout submittals and send them off, each maker's warranty document already in the set.
In your portal you pick the brand and confirm what's in your scope. Then download the package or send it on for review from there. Nothing to install or learn.
After approvalBETA
Once your items come back approved, your portal gives you a procurement and tracking log built from them, one row per approved item. You fill in who's buying it, the supplier, the PO, and the dates it has to be ordered and on site. Download it to Excel or CSV anytime and move it into the systems you already use.
| Approved item | Owner | Supplier | PO | Order by | On site | Status |
|---|---|---|---|---|---|---|
| Series fan-powered VAV unitM-005 · 23 36 00 · Rev 1 | Purchasing | Supply house A | 4471 | Jan 25 | Apr 5 | Ordered |
| Lighting and appliance panelboards26 24 16 · Rev 0 | PM | Supply house B | Jan 11 | May 3 | Not ordered | |
| Main switchgear26 23 00 · Rev 2 | PM | Maker direct | Nov 9 | Mar 1 | Past order-by date |
Same item
Built from what was approved
Every row starts as an item that came back approved, so the product you order is the one the reviewer signed off on.
Your details
You fill it in
You add the owner, supplier, PO and the dates. The log shows anything past its order-by date, so nothing quietly slips.
Any system
Excel or CSV
Download the log anytime and bring it into your scheduling, purchasing or accounting system.
On time
Project managers
Early packages protect the back end of the schedule, and your crew isn't left waiting on material.
Margin
Owners
You front the material. Catching the wrong product at submittal keeps it from becoming a change order or a restocking fee.
Next bid
Business development
GCs keep a call-first list. A clean submittal is a reference for the next job.
No. We line up what the spec allows and check it. Two calls stay yours: which brand you want, based on price and availability, and whether an item is in your scope. Then you send it on for review.
Product data for materials and off-the-shelf equipment. We do not provide shop drawings or cut sheets for custom materials that require fabrication.
Within 48 hours of the complete set: the drawings and the spec book.
Send the job's drawings and spec book to
Your first package is free while we test. It's back within 48 hours of the complete set. Or leave your work email and we'll reach out.