Plain answers about submittals.
From the people who package and review them. No forms to download a PDF, no gated anything: the whole answer is on the page.
What is a submittal?
What a submittal is, the main types, shop drawings vs. product data, who reviews it, a real example, and what a deferred submittal means.
Read the basics →The submittal review checklist
What to check on every item, in the order a reviewer actually runs it, and what Division 01 lets you return on arrival.
Read the checklist →How long does submittal review take?
What contracts allow, why reviews run past the window, what a rejection really costs, and what one measured package showed.
Read the answer →How to prepare a submittal package
The six steps from spec to transmittal that get a package approved on the first pass.
Read the steps →Why submittals get rejected
The eight reasons packages come back revise and resubmit or rejected, and the fix for each one before it leaves your desk.
Read the reasons →Basis of design, or equal, and substitutions
What the basis of design is, what an equal has to prove, and when a different product needs a substitution request instead of a submittal.
Read the guide →The submittal log template
A free Excel log, one row per item, that works out the date each submittal has to go out from the need-on-site date and lead time.
Get the template →Electrical submittals
What goes in Division 26 submittals, why gear goes first, and what to check on panelboards, devices and lighting before the package leaves.
Read the guide →Mechanical submittals
What goes in Division 23 submittals, why rooftop units and air handlers go first, and what to check on equipment, terminal units and air distribution.
Read the guide →Cross-trade conflicts
How a submittal passes its own review and still clashes with another trade, with real examples and the check that catches them.
Read the guide →